So the paint, tile, flooring, tub and toilet are done. Baseboards, trim, shower rod, tile sealing, sink, light fixtures and other hardware are on the to be done list.
I will be so bold to say that I believe we will be showering in our own bathroom sometime next weekend ;-)
No comments:
Post a Comment